Prepare ventilation and air-conditioning routes, connections and unit installation, coordinating power, drainage and ceilings before finishes are closed.
Preparation and installation
We review equipment type and count, routes, condensate drainage and power points. Equipment capacity and final design depend on site requirements and the specialist design.
Operation and maintenance
Testing, cleaning, repairs and replacement parts are scoped. Equipment purchase, piping and additional connections are itemized in the proposal.
Prepare these details for a quote
- Project location, areas or quantities, and available drawings.
- Equipment types, quantities, plans and connection routes.
- Specify labour-only or supply and labour, and the required specifications.
Does the price include air-conditioning units?
This is specified in the proposal: installation-only or supply and installation. Units are not automatically included in connection or finishing rates.