Prepare yards, paths and parking and install paving and kerbs to the areas and levels, reviewing drainage and interfaces with existing services.
Base, levels and drainage
Ground condition, layers, fill, compaction and drainage falls are reviewed before paving. Removal and ground treatment are separately defined items.
Materials and quantity breakdown
Specify paving pattern, thickness, kerbs and traffic zones; separate areas, lengths and any extra irrigation, planting or lighting.
Prepare these details for a quote
- Project location, areas or quantities, and available drawings.
- Site use: yard, path or parking, and preferred paving type.
- Current-condition photos, execution date and site access requirements.
Does paving include filling and compaction?
The proposal specifies this after the site layers are reviewed; base preparation can be separated from paving and kerb supply and installation.